
	
{"id":27442,"date":"2025-12-11T13:08:49","date_gmt":"2025-12-11T11:08:49","guid":{"rendered":"https:\/\/smartbuildingexpo.it\/?p=27442"},"modified":"2025-12-11T13:24:47","modified_gmt":"2025-12-11T11:24:47","slug":"focus-on-conto-termico-3-0","status":"publish","type":"post","link":"https:\/\/smartbuildingexpo.it\/en\/news-2\/focus-on-conto-termico-3-0\/","title":{"rendered":"Focus on Conto Termico 3.0"},"content":{"rendered":"<p data-start=\"82\" data-end=\"405\"><strong>During SBE25, it was one of the most debated topics among industry professionals, and now it is becoming a reality: starting from Christmas 2025, the new Conto Termico 3.0 will come into effect\u2014a concrete opportunity for those who want to cut energy consumption and perhaps make their home or building a little \u201cgreener.\u201d<\/strong><\/p>\n<p data-start=\"407\" data-end=\"718\">Conto Termico 3.0 is a <strong data-start=\"430\" data-end=\"453\">non-repayable grant<\/strong>, not a tax deduction. This means that if the works meet the requirements, the money\u2014or rather, a significant portion of what is spent\u2014is reimbursed directly to the bank account.<br data-start=\"631\" data-end=\"634\" \/>It is not limited to second homes\u2014the measure applies regardless of property type.<\/p>\n<p data-start=\"720\" data-end=\"742\"><strong data-start=\"720\" data-end=\"740\">Who is eligible:<\/strong><\/p>\n<ul data-start=\"744\" data-end=\"945\">\n<li data-start=\"744\" data-end=\"817\">\n<p data-start=\"746\" data-end=\"817\">Private citizens (including condominiums) for residential properties;<\/p>\n<\/li>\n<li data-start=\"818\" data-end=\"862\">\n<p data-start=\"820\" data-end=\"862\">Companies and tertiary sector buildings;<\/p>\n<\/li>\n<li data-start=\"863\" data-end=\"945\">\n<p data-start=\"865\" data-end=\"945\">Public entities, third-sector organizations, and renewable energy communities.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"947\" data-end=\"1060\">In short, almost all possible scenarios\u2014from apartments to warehouses, schools, and workplaces\u2014can be included.<\/p>\n<p data-start=\"1062\" data-end=\"1090\"><strong data-start=\"1062\" data-end=\"1088\">Eligible interventions<\/strong><\/p>\n<p data-start=\"1092\" data-end=\"1141\">Conto Termico 3.0 covers a wide range of works:<\/p>\n<ul data-start=\"1143\" data-end=\"1622\">\n<li data-start=\"1143\" data-end=\"1357\">\n<p data-start=\"1145\" data-end=\"1357\"><strong data-start=\"1145\" data-end=\"1179\">Energy efficiency improvements<\/strong>, such as insulation, thermal cladding, wall and roof insulation, replacement of windows or old closures, installation of solar shading, and overall building envelope upgrades.<\/p>\n<\/li>\n<li data-start=\"1358\" data-end=\"1622\">\n<p data-start=\"1360\" data-end=\"1622\"><strong data-start=\"1360\" data-end=\"1430\">Modern systems for producing thermal energy from renewable sources<\/strong>, including heat pumps (and hybrid systems), biomass boilers, solar thermal systems, and in some cases, photovoltaic systems with storage or electric vehicle charging stations\u2014if compatible.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"1624\" data-end=\"1654\"><strong data-start=\"1624\" data-end=\"1652\">Savings and disbursement<\/strong><\/p>\n<ul data-start=\"1656\" data-end=\"2129\">\n<li data-start=\"1656\" data-end=\"1742\">\n<p data-start=\"1658\" data-end=\"1742\">For private individuals, the incentive can cover up to <strong data-start=\"1713\" data-end=\"1739\">65% of the expenditure<\/strong>.<\/p>\n<\/li>\n<li data-start=\"1743\" data-end=\"1916\">\n<p data-start=\"1745\" data-end=\"1916\">For public buildings (or entities), in certain cases\u2014for example, small municipalities or structures in towns with only a few thousand inhabitants\u2014it can reach <strong data-start=\"1905\" data-end=\"1913\">100%<\/strong>.<\/p>\n<\/li>\n<li data-start=\"1917\" data-end=\"2023\">\n<p data-start=\"1919\" data-end=\"2023\">If the expense is modest (usually up to about \u20ac15,000), the reimbursement is made in a single payment.<\/p>\n<\/li>\n<li data-start=\"2024\" data-end=\"2129\">\n<p data-start=\"2026\" data-end=\"2129\">If the amount exceeds this threshold\u2014or for larger entities\u2014the payment can be <strong data-start=\"2105\" data-end=\"2126\">installment-based<\/strong>.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"2131\" data-end=\"2346\">The total fund allocated for the measure is <strong data-start=\"2175\" data-end=\"2200\">\u20ac900 million per year<\/strong>, of which around \u20ac500 million is for private individuals and businesses, and \u20ac400 million for public administrations and third-sector entities.<\/p>\n<p data-start=\"2348\" data-end=\"2402\"><strong data-start=\"2348\" data-end=\"2400\">Why it is advantageous compared to other bonuses<\/strong><\/p>\n<ul data-start=\"2404\" data-end=\"3025\">\n<li data-start=\"2404\" data-end=\"2557\">\n<p data-start=\"2406\" data-end=\"2557\">No \u201ctax capacity\u201d is required: it is not a tax credit, so it does not depend on how much tax you pay. You receive the contribution in cash, directly.<\/p>\n<\/li>\n<li data-start=\"2558\" data-end=\"2648\">\n<p data-start=\"2560\" data-end=\"2648\">It can cover a significant portion of expenses: up to 65% (or more, in certain cases).<\/p>\n<\/li>\n<li data-start=\"2649\" data-end=\"2851\">\n<p data-start=\"2651\" data-end=\"2851\"><strong data-start=\"2651\" data-end=\"2672\">Broad flexibility<\/strong>: it is not limited to old boilers or insulation, but also includes heat pumps, modern systems, public buildings, businesses, condominiums, communities, and the tertiary sector.<\/p>\n<\/li>\n<li data-start=\"2852\" data-end=\"3025\">\n<p data-start=\"2854\" data-end=\"3025\"><strong data-start=\"2854\" data-end=\"2881\">Relatively quick timing<\/strong> (or at least faster than a decade-long deduction) and a tangible refund\u2014a key advantage if you don\u2019t want to wait years to \u201csee\u201d the benefit.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"3027\" data-end=\"3052\"><strong data-start=\"3027\" data-end=\"3050\">When it can be used<\/strong><\/p>\n<ul data-start=\"3054\" data-end=\"3412\">\n<li data-start=\"3054\" data-end=\"3139\">\n<p data-start=\"3056\" data-end=\"3139\">The decree establishing Conto Termico 3.0 was published on <strong data-start=\"3115\" data-end=\"3136\">26 September 2025<\/strong>.<\/p>\n<\/li>\n<li data-start=\"3140\" data-end=\"3202\">\n<p data-start=\"3142\" data-end=\"3202\">The measure becomes operational from <strong data-start=\"3179\" data-end=\"3199\">25 December 2025<\/strong>.<\/p>\n<\/li>\n<li data-start=\"3203\" data-end=\"3412\">\n<p data-start=\"3205\" data-end=\"3412\">Many expect that the actual window for submitting applications\u2014through the platform managed by GSE\u2014will open in the <strong data-start=\"3321\" data-end=\"3360\">early months of 2026 (around March)<\/strong>, once all implementing regulations are finalized.<\/p>\n<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>During SBE25, it was one of the most debated topics among industry professionals, and now it is becoming a reality: starting from Christmas 2025, the new Conto Termico 3.0 will come into effect\u2014a concrete opportunity for those who want to cut energy consumption and perhaps make their home or building a little \u201cgreener.\u201d<\/p>\n","protected":false},"author":21,"featured_media":27435,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_ef_editorial_meta_date_first-draft-date":"","_ef_editorial_meta_paragraph_assignment":"","_ef_editorial_meta_checkbox_needs-photo":"","_ef_editorial_meta_number_word-count":"","footnotes":""},"categories":[783],"tags":[],"class_list":["post-27442","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-2"],"_links":{"self":[{"href":"https:\/\/smartbuildingexpo.it\/en\/wp-json\/wp\/v2\/posts\/27442","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/smartbuildingexpo.it\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/smartbuildingexpo.it\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/smartbuildingexpo.it\/en\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/smartbuildingexpo.it\/en\/wp-json\/wp\/v2\/comments?post=27442"}],"version-history":[{"count":1,"href":"https:\/\/smartbuildingexpo.it\/en\/wp-json\/wp\/v2\/posts\/27442\/revisions"}],"predecessor-version":[{"id":27443,"href":"https:\/\/smartbuildingexpo.it\/en\/wp-json\/wp\/v2\/posts\/27442\/revisions\/27443"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/smartbuildingexpo.it\/en\/wp-json\/wp\/v2\/media\/27435"}],"wp:attachment":[{"href":"https:\/\/smartbuildingexpo.it\/en\/wp-json\/wp\/v2\/media?parent=27442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/smartbuildingexpo.it\/en\/wp-json\/wp\/v2\/categories?post=27442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/smartbuildingexpo.it\/en\/wp-json\/wp\/v2\/tags?post=27442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}